Step | Action | Value(s) | Yes | No | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 |
Is the measured voltage within the specified range? | 5V | ||||||||||||
Using a DMM, measure the voltage between the generator BAT terminal and ground. Is the voltage measured within the specified range? | 9-14V | |||||||||||||
Is the voltage measured within the specified range? | 13-16V | |||||||||||||
Load test the generator. Refer to Generator Not Operating Properly in Engine Electrical for service procedure. Does the generator operate properly? | -- | |||||||||||||
Replace the battery. Refer to Battery Replacement in Engine Electrical. Is the repair complete? | -- | Go to Charging System Check | -- | |||||||||||
Check for poor connection or open in circuit 225. Is there a poor connection or open in circuit 225? | -- | |||||||||||||
Repair the poor connection or open in circuit 225. Is the repair complete? | -- | Go to Charging System Check | -- | |||||||||||
The Powertrain Control Module (PCM) is not enabling circuit 225, thus disabling the generator. Refer to Powertrain Control Module Diagnosis in Engine Controls for further diagnosis and repair of the PCM. Is the action complete? | -- | Go to Charging System Check | -- | |||||||||||
Repair poor connection or open in circuit 2 or the fusible link to the generator BATT terminal. Is the repair complete? | -- | Go to Charging System Check | -- | |||||||||||
Replace the generator. Refer to Generator Replacement in Engine Electrical. Is the repair complete? | -- | Go to Charging System Check | -- |