Tighten
Tighten the negative cable nut to engine block stud to 22 N·m
(16 lb ft).
Tighten
Tighten the negative cable nut at the ground terminal to 6 N·m
(53 lb in).
• | Open the positive cable cap. |
• | Remove the battery cable to fuseblock stud nut. |
• | Remove the positive cable from the fuseblock stud. |
• | Slide the boot down revealing the positive terminal stud. |
• | Remove the positive cable nut from the generator output stud. |
• | Remove the positive cable. |
Tighten
Tighten the positive cable to starter motor nut (3) to 10 N·m
(89 lb in).
• | Install the positive cable. |
• | Install the positive cable nut to the generator output stud. |
Tighten
Tighten the positive cable nut to the generator output stud to 22 N·m
(16 lb ft).
• | Slide the boot over the positive terminal stud. |
Tighten
Tighten the wiring harness ground and RF ground strap and cruise control
ground lead bolt to 12 N·m (106 lb in).
• | Install the positive cable to the fuseblock stud. |
• | Install the positive cable to fuseblock stud nut. |
Tighten
Tighten the positive cable to fuseblock stud nut to 14 N·m
(10 lb ft).
• | Close the positive cable cap. |
• | Open the positive cable cap. |
• | Remove the positive cable to fuseblock stud nut. |
• | Remove the positive cable from the fuseblock stud. |
• | Slide the boot down revealing the positive terminal stud. |
• | Remove the positive cable nut from the generator input stud. |
• | Remove the positive cable. |
• | Remove the positive cable RF ground nut (2). |
• | Remove the harness clamp from the stud. |
• | Remove the RF ground strap. |
• | Remove the positive cable to starter motor nut (1). |
• | Remove the positive cable from the harness conduit. |
Tighten
Tighten the positive cable to starter motor nut (1) to 10 N·m
(89 lb in).
• | Install the RF ground strap. |
• | Install the harness clamp to the stud. |
• | Install the positive cable RF ground nut (2). |
Tighten
Tighten the positive cable RF ground nut to 25 N·m (18 lb ft).
Tighten
Tighten the wiring harness ground bolt to 12 N·m (106 lb in).
• | Install the positive cable to the stud. |
• | Install the positive cable nut to the generator output stud. |
Tighten
Tighten the positive cable nut to generator output stud to 22 N·m
(16 lb ft).
• | Slide the boot over the generator output stud. |
• | Install the positive cable to the fuseblock stud. |
• | Install the positive cable to fuseblock stud nut. |
Tighten
Tighten the positive cable to fuseblock stud nut to 14 N·m
(10 lb ft).
• | Close the positive cable cap. |
Tighten
Tighten the negative cable to engine block bolt (1) to 32 N·m
(24 lb ft).
Tighten
Tighten the negative at cable ground terminal nut to 6 N·m
(53 lb in).