GM Service Manual Online
For 1990-2009 cars only
Makes
🢒
Pontiac
🢒
2009
🢒
Vibe - AWD
🢒
Diagnostic Navigation
🢒
Vehicle Diagnostic Information
🢒 Throttle Body Assembly Replacement
Removal Procedure
Drain the engine coolant. Refer to
Cooling System Draining and Filling
.
Remove the engine cover. Refer to
Engine Cover Replacement
.
Remove the air cleaner cap sub-assembly with hose.
Disconnect the mass air flow meter connector (3) and the 2 wire harness clamps (1, 2).
Disconnect the ventilation hose and loosen the hose clamp (2).
Unlock the 2 clamps (1) and remove the air cleaner cap sub-assembly with hose.
Disconnect the throttle body connector (1) and the 2 water by-pass hoses (2).
Remove the 2 bolts (2, 4) and the 2 nuts (1, 3), and remove the throttle body assembly.
Remove the gasket (1) from the intake manifold.
Installation Procedure
Install a new gasket (1) onto the intake manifold.
Caution:
Refer to
Fastener Caution
in the Preface section.
Install the throttle body assembly with the 2 bolts and 2 nuts and tighten to
10N·m (7 lb ft)
.
Connect the 2 water by-pass hoses (2) and the throttle body connector (1).
Install the air cleaner cap sub-assembly with hose and lock the 2 clamps.
Tighten the hose clamp (1) to
2.0N·m (18 lb in)
.
Connect the ventilation hose (1).
Connect the wire harness clamp (1, 2) and mass air flow meter connector (3).
Add engine coolant. Refer to
Cooling System Draining and Filling
.
Inspect for a coolant leak.
Install the engine cover. Refer to
Engine Cover Replacement
.