- Install the cross vehicle
beam to the vehicle.
- Install the bolts which
secure the right cross vehicle beam to the hinge pillar.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the bolts
which secure the left cross vehicle beam to the hinge pillar.
Tighten
Tighten both sets of bolts to 20 N·m (15 lb ft).
- Install the retaining
bolts to the HVAC module upper support brackets.
Tighten
Tighten the bolts to 10 N·m (89 lb in).
- Install the HVAC module
center support bracket.
- Install the retaining bolts to the HVAC module center support
bracket.
Tighten
Tighten the bolts to 10 N·m (89 lb in).
- Position the IP wiring harness and install the harness retaining
clips.
- Install the BCM bracket
and the retaining bolts.
Tighten
Tighten the BCM bracket bolts to 10 N·m (89 lb in).
- Install the air distribution ducts. Refer to
Auxiliary Air Distributor Duct Replacement
in HVAC- Manual.
- Install the fuse block
to the holder.
- Install the brake pedal
reinforcement nuts.
Tighten
Tighten the nuts to 50 N·m (37 lb ft).
- Install the passenger side SIR inflator module. Refer to
Inflatable Restraint Instrument Panel Module Replacement
in SIR.
- Install the IP trim pad. Refer to
Instrument Panel Trim Pad Replacement
.