Step
| Action
| Value(s)
| Yes
| No
|
1
|
- Turn the ignition switch to the OFF position.
- Disconnect the generator connector.
- Turn the ignition switch to the ON position.
- Connect a scan tool to the Data Link Connector (DLC).
- On the scan tool, perform the following:
• | Select: Powertrain Control Module (PCM) |
• | Select: Special Functions. |
• | Select: Engine Output Controls. |
• | Select: GEN L Terminal. |
• | Command the generator ON. |
- Using a DMM, measure the voltage between the generator harness
connector terminal B and ground.
Is the measured voltage within the specified range?
| 5 V
| Go to
Step 2
| Go to
Step 6
|
2
| Using a DMM, measure the voltage between the generator
BATT terminal and ground.
Is the voltage measured within the specified range?
| 9-14 V
| Go to
Step 3
| Go to
Step 9
|
3
|
- Reconnect the generator connector.
- Turn OFF all the accessories.
- Run the engine at idle speed.
- Using DMM, measure the voltage across the battery terminals.
Is the voltage measured within the specified range?
| 13-16 V
| Go to
Step 4
| Go to
Step 10
|
4
| Load test the generator.
Refer to
Charge Indicator Inoperative
.
Does the generator operate properly?
| --
| Go to
Step 5
| Go to
Step 10
|
5
|
- Replace the battery. Refer to
Battery Replacement
.
- Recheck the system.
Is the repair complete?
| --
| Go to
Charging System Check
.
| --
|
6
| Inspect for a poor connection or an open in CKT 225.
Is there a poor connection or open in CKT 225?
| --
| Go to
Step 7
| Go to
Step 8
|
7
|
- Repair a poor connection or an open in CKT 225.
- Recheck the system.
Is the repair complete?
| --
| Go to
Charging System Check
| --
|
8
|
- The Powertrain Control Module (PCM) is not enabling CKT 225,
thus disabling the generator. Refer to
Powertrain On Board Diagnostic (OBD) System Check
(RPO 3.1L) or
Powertrain On Board Diagnostic (OBD) System Check
(RPO 3.8L) in
Engine Controls.
- Recheck the system.
Is the repair complete?
| --
| Go to
Charging System Check
| --
|
9
|
- Repair a poor connection or an open in CKT 2 or the fusible
link to the generator BATT terminal.
- Recheck the system.
Is the repair complete?
| --
| Go to
Charging System Check
| --
|
10
| Replace the generator.
Has the repair been made and the system rechecked?
| --
| Go to
Charging System Check
| --
|