GM Service Manual Online
For 1990-2009 cars only

Removal Procedure


    Object Number: 571436  Size: SH
  1. Remove the right side insulator. Refer to Instrument Panel Insulator Panel Replacement - Right Side in Instrument Panel, Gauges and Console.
  2. Remove the left side insulator. Refer to Instrument Panel Insulator Panel Replacement - Left Side in Instrument Panel, Gauges and Console.
  3. Remove the instrument panel (IP) compartment door hinge screws.
  4. Remove the IP compartment door.
  5. Remove the heating, ventilation and air conditioning (HVAC) module screws.
  6. Remove the HVAC module cover.
  7. Disconnect the air inlet valve linkage.
  8. Remove the air inlet valve actuator (2) and vacuum hose.

Installation Procedure


    Object Number: 571436  Size: SH
  1. Install the air inlet valve actuator (2) and vacuum hose.
  2. Connect the air inlet valve linkage.
  3. install the HVAC module cover.
  4. Install the HVAC module screws.
  5. Tighten
    Tighten the HVAC module screws to 1.8 N·m (16 lb in).

  6. Install the IP compartment door.
  7. Install the IP compartment hinge screws.
  8. Tighten
    Tighten the IP compartment hinge screws to 2.8 N·m (25 lb in).

  9. Install the left side insulator. Refer to Instrument Panel Insulator Panel Replacement - Left Side in Instrument Panel, Gauges and Console.
  10. Install the right side insulator. Refer to Instrument Panel Insulator Panel Replacement - Right Side in Instrument Panel, Gauges and Console.