Step | Action | Yes | No |
---|---|---|---|
Schematic Reference: Headlights/Daytime Running Lights (DRL) Schematics Connector End View Reference: Master Electrical Component List in Wiring Systems DEFINITION: Low beam headlamps are ON at all times, all other exterior lamps are OFF. | |||
1 | Did you perform the Diagnostic System Check - Vehicle? | Go to Step 2 | Go to Diagnostic System Check - Vehicle in Vehicle DTC Information |
2 |
Important:: Vehicle shift lever must be out of the PARK position in order for the daytime running lamps (DRL) to operate.
Did the DRL operate properly? | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems | Go to Step 3 |
3 |
Does the scan tool display OFF status? | Go to Step 4 | Go to Step 6 |
4 |
Did the DRL turn OFF? | Go to Step 5 | Go to Step 10 |
5 | Connect a test lamp between the DRL relay coil side supply voltage circuit and the DRL relay control circuit. Does the test lamp illuminate? | Go to Step 6 | Go to Step 9 |
6 | Test the DRL relay control circuit of the DRL relay for a short to ground. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 13 | Go to Step 7 |
7 | Test the twilight sentinel delay signal circuit of the DIM for a short to battery positive voltage. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 13 | Go to Step 8 |
8 | Inspect for poor connections at the DIM. Refer to Testing for Intermittent Conditions and Poor Connections and Connector Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 13 | Go to Step 11 |
9 | Inspect for poor connections at the DRL relay. Refer to Testing for Intermittent Conditions and Poor Connections and Connector Repairs in Wiring Systems. Did you find and correct the condition? | Go to Step 13 | Go to Step 12 |
10 | Repair the short to battery positive voltage in the DRL supply voltage circuit. Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Did you complete the repair? | Go to Step 13 | -- |
11 | Replace the DIM. Refer to Control Module References in Computer/Integrating Systems for replacement, setup, and programming. Did you complete the replacement? | Go to Step 13 | -- |
12 | Replace the DRL relay. Refer to Relay Replacement in Wiring Systems. Did you complete the replacement? | Go to Step 13 | -- |
13 | Operate the system in order to verify the repair. Did you correct the condition? | System OK | Go to Step 2 |