Removal Procedure
- Raise the vehicle. Refer to
Lifting and Jacking the Vehicle
in General Information.
- Remove the bank 2 intermediate pipe/hose from the secondary
air injection (AIR) pump.
- Lower the vehicle.
- Loosen the pinch clamp connecting the bank 2 intermediate
pipe/hose to the bank 2 shut-off valve.
- Remove the bank 2 intermediate pipe/hose.
Installation Procedure
- Install the bank 2 intermediate pipe/hose.
- Install the pinch clamp connecting the bank 2 intermediate
pipe/hose to the bank 2 shut-off valve.
- Raise the vehicle. Refer to
Lifting and Jacking the Vehicle
in General Information.
- Install the bank 2 intermediate pipe/hose and clamp to
the AIR pump.
- Lower the vehicle.