Obtain the recommended tubing and steel fitting nuts of correct
size. (Outside diameter of the tubing is used to specify size.)
Cut the tubing to length. You can determine the length needed
by measuring the old pipe using a string and adding 3.2 mm (1/8 in)
for each ISO flare.
Install the fittings on the tubing before starting flare.
Chamfer the inside and the outside diameter of tubing with the
deburring tool. Then flare the tubing ends using an ISO flaring tool, such
as J 29803-A
ISO Flaring
Kit. Follow the instructions included with the tool.
Carefully bend the tubing to match the old pipe. Clearance of
19 mm (3/4 in) must be maintained between the pipe and all moving
or vibrating parts.