Removal Procedure
- Remove the left-side instrument panel insulator. Refer to
Closeout/Insulator Panel Replacement - Left in Instrument Panel,
Gauges and Console.
- Remove the left-side carpet retainer. Refer to
Door
Sill Plate Replacement - Front in Interior Trim.
- Remove the park brake indicator switch
electrical connector.
- Remove the park brake indicator switch screw.
- Remove the parking brake indicator switch.
Installation Procedure
- Install the park brake indicator switch.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the park brake indicator switch
screw.
Tighten
Tighten the park brake indicator switch screw to 3 N·m
(27 lb in).
- Install the park brake indicator switch
electrical connector.
- Install the left-side carpet retainer. Refer to
Door
Sill Plate Replacement - Front in Interior Trim.
- Install the left-side instrument panel insulator. Refer to
Closeout/Insulator Panel Replacement - Left in Instrument Panel,
Gauges and Console.