Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
Important: A short to ground will cause an open fuse(s). Before performing this diagnostic procedure, inspect the fuse(s) for an open. | ||||
1 |
Does the resistance measure within the specified range? | 0-2 ohms | Go to Step 2 | Go to Step 3 |
2 | Use the DMM in order to measure the voltage between terminal A of the vanity mirror lamp connector and ground. Does the voltage measure to the specified value? | B+ | Go to Step 4 | Go to Step 5 |
3 | Repair the open in CKT 750 between the right vanity mirror lamp and ground splice pack G401. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
4 | Replace the right vanity mirror lamp. Refer to RH Vanity Mirror Lamp in Roof. Is the repair complete? | -- | -- | |
5 | Use the DMM in order to backprobe the left IP junction block connector C3. Measure the voltage between terminal C4 and ground. Does the voltage measure to the specified value? | B+ | Go to Step 6 | Go to Step 7 |
6 | Repair the open in CKT 1732 between the left IP junction block and the right vanity mirror lamp. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
7 | Replace the left IP junction block. Refer to Relay/Fuse Center Replacement in Wiring Systems. Is the repair complete? | -- | -- |