GM Service Manual Online
For 1990-2009 cars only

Removal Procedure

    Caution: Unless directed otherwise, the ignition and start switch must be in the OFF or LOCK position, and all electrical loads must be OFF before servicing any electrical component. Disconnect the negative battery cable to prevent an electrical spark should a tool or equipment come in contact with an exposed electrical terminal. Failure to follow these precautions may result in personal injury and/or damage to the vehicle or its components.

  1. Disconnect the negative battery cable.
  2. Remove the instrument panel carrier. Refer to Instrument Panel Carrier Replacement
  3. Disconnect the wiring harness from the cross vehicle beam.

  4. Object Number: 291493  Size: SH
  5. Remove the bolts (2) from the bracket that joins the cross vehicle beam to the HVAC module (3).

  6. Object Number: 291494  Size: SH
  7. Remove the bolts that join the cross vehicle beam (1) to the front of the dash (2).
  8. Remove the cross vehicle beam.

Installation Procedure


    Object Number: 291494  Size: SH
  1. Install the cross vehicle beam (1) to the front of the dash (2).
  2. Install the bolts.

  3. Object Number: 291493  Size: SH
  4. Install the bolts that join the cross vehicle beam to the HVAC module bracket (3).
  5. Connect the wiring harness to the cross vehicle beam.
  6. Install the instrument panel.