Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 |
Does voltmeter read battery voltage? | 12 V | ||
2 | Connect the voltmeter from terminal BAT at generator to ground. Does voltmeter read battery voltage? | 12 V | ||
3 |
Is the voltmeter reading within range? | 13-16 V | ||
4 | Backprobe BRN (25) wire at the instrument cluster connector with a voltmeter to ground Does voltmeter read battery voltage? | 12 V | ||
5 | Backprobe PNK (39) wire at the instrument cluster connector terminal 22 with a voltmeter to ground. Does battery voltage exist? | -- | ||
6 | Repair or replace the black/red wire from the fusible link to generator. Is the repair complete? | System OK | -- | |
7 | Perform battery load test. Refer to Battery Load Test . Is the test complete? | -- | System OK | -- |
8 | Perform generator bench test. Refer to Generator Assembly Bench Check (CS-144) for the CS-144. Refer to Generator Assembly Bench Check (CS-130) for the CS-130. Is the generator okay? | -- | ||
9 | Locate and repair open in BRN (25) wire from the instrument cluster to generator. Is the repair complete? | -- | System OK | -- |
10 | Check the charge indicator filament. Is the charge indicator filament okay? | -- | -- | |
11 | Locate and repair open in PNK (39) wire from the I/P fuse block to the instrument cluster. Is the repair complete? | -- | System OK | -- |
12 | Replace the instrument cluster. Is the replacement complete? | -- | System OK | -- |