Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 |
Does the test lamp light? | -- | ||
2 | Connect a test lamp between terminal C and terminal B on the right park and turn lamp harness connector. Does the test lamp light? | -- | ||
3 | Repair the open in CKT 9 (BRN) (9) between S 102 and terminal C in the right park and turn lamp harness connector. Is the repair complete? | -- | System OK | -- |
4 | Repair the open in right park and turn Lamp assembly. Is the repair complete? | -- | System OK | -- |
5 | Repair the open in CKT 150 (BLK) between S 105 and terminal B in the right park and turn lamp harness connector. Is the repair complete? | -- | System OK | -- |