Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Did you perform the Instrument Cluster System Check? | -- | Go to Step 2 | |
2 |
Is continuity present? | -- | Go to Step 4 | Go to Step 3 |
3 | Locate and repair the open in CKT 150 (BLK) between the TR Switch and G105. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
4 |
Is battery voltage present? | -- | Go to Step 6 | Go to Step 5 |
5 | Locate and repair the open in CKT 1020 (PNK) between the IP Fuse Block and the I/P Cluster. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
6 | Connect a J 39200 DMM (continuity) between pin 11 of the I/P Cluster connector to ground. Is continuity present? | -- | Go to Step 8 | Go to Step 7 |
7 | Locate and repair the open in CKT 451 (BLK/WHT) between the I/P Cluster and ground. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- | |
8 | Replace the I/P Cluster. Refer to Instrument Cluster Replacement . Is the repair complete? | -- | -- |