Step | Action | Value(s) | Yes | No | ||||||
---|---|---|---|---|---|---|---|---|---|---|
Tools Required
| ||||||||||
1 | Was the Data Link Communications System Check performed? | -- | ||||||||
2 |
Does the scan tool turn ON? | -- | ||||||||
3 |
Did the test lamp light? | -- | ||||||||
4 | Repair open battery positive voltage CKT. Refer to Wiring Repairs in Wiring Systems. Did you complete the repair? | -- | -- | |||||||
5 | Test ground CKT cavities 4 and 5 for continuity to ground. Refer to Testing for Continuity in Wiring Systems. Is the resistance within the specified value? | 0-5 ohms | Go to Step 7 | Go to Step 6 | ||||||
6 | Repair open ground CKT(s). Refer to Wiring Repairs in Wiring Systems. Did you complete the repair? | -- | -- | |||||||
7 |
Is the replacement complete? | -- | -- |