Removal Procedure

    Caution: Refer to Battery Disconnect Caution in the Preface section.

  1. Disconnect the negative battery cable.
  2. Remove the console. Refer to Console Replacement .
  3. Remove the left sound insulator. Refer to Instrument Panel Insulator Panel Replacement - Left Side .
  4. Remove the knee bolster.
  5. Place the transmission shift lever in the P (Park) position.
  6. Important: Do not proceed to the next step with the key in any other position.

  7. Turn the ignition key to the RUN position.

  8. Object Number: 104584  Size: SH
  9. Insert a screwdriver blade into the slot provided in the ignition switch inhibitor.
  10. Depress the cable latch. Pull the control cable from the inhibitor.

  11. Object Number: 104585  Size: SH
  12. Push the cable connector lock button at the shifter base to the up position.
  13. Snap the cable from the park/lock lever pin.
  14. Depress the two cable latches. Remove the control cable from the transmission control.

Installation Procedure


    Object Number: 1239112  Size: SH
  1. Cut the park lock cable adjuster and cable off at the location just before the end of the retaining barb.
  2. Tie the inhibitor end of the new cable to the old cable in an overlapping fashion using zip ties or electrical tape.
  3. Carefully use the old cable to route the new cable. If the cable becomes stuck, move the lower part of the cable toward the RH side of the vehicle while pulling the upper half gently.
  4. The cable is routed between the HVAC plenum and the vehicle cowl.

  5. Object Number: 104585  Size: SH
  6. Place the shift lever in P (Park).
  7. Snap the control cable connector into the automatic transmission control.
  8. Place the ignition key in the RUN position.

  9. Object Number: 104584  Size: SH

    Important: Do not insert the cable with the key in any other position.

  10. Snap the control cable into the inhibitor housing until the snap lock is seated.
  11. Turn the key to the LOCK position.

  12. Object Number: 104585  Size: SH
  13. Snap the control cable end onto the shift park/lock lever pin.

  14. Object Number: 104584  Size: SH

    Important: Test for proper operation of the park/lock control cable before installing the steering column to the instrument panel. Ensure that the park lock cable functions as designed. With the key in the OFF position, the shift lever should not be able to be moved from the Park position. With the key in the ON position, the key must not be able to be removed from the ignition cylinder. If either of these tests are not passed, Refer to Park Lock Cable Adjustment .

  15. Raise and connect the steering column.
  16. Tighten the lower steering column bracket bolts.
  17. Install the knee bolster.
  18. Install the left sound insulator. Refer to Instrument Panel Insulator Panel Replacement - Left Side .
  19. Install the console. Refer to Console Replacement .
  20. Connect the negative battery cable.