Removal Procedure
- Remove the right side instrument panel insulator. Refer to
Instrument Panel Insulator Panel Replacement - Right Side
in Instrument
Panel, Gages and Console.
- Disconnect the
electrical connector from the blower control module.
- Remove the two heat stakes from the blower control module using a small
chisel.
- Remove the blower control module.
Installation Procedure
- Install the blower control module.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the two new screws in the pre drilled holes to the side of the heat
stakes in the blower control module and HVAC module assembly.
Tighten
Tighten the screws to 1.5 N·m (13 lb in).
- Connect the electrical
connector to the blower control module.
- Install the right side instrument panel insulator. Refer to
Instrument Panel Insulator Panel Replacement - Right Side
in Instrument
Panel, Gages and Console.