GM Service Manual Online
For 1990-2009 cars only

Removal Procedure

Important: When replacing battery cables be sure to use replacement cables that are the same type, gauge and length.

    Caution: Before servicing any electrical component, the ignition and start switch must be in the OFF or LOCK position and all electrical loads must be OFF, unless instructed otherwise in these procedures. If a tool or equipment could easily come in contact with a live exposed electrical terminal, also disconnect the negative battery cable. Failure to follow these precautions may cause personal injury and/or damage to the vehicle or its components.

  1. Disconnect the negative battery cable from the battery. Refer to Battery Negative Cable Disconnection and Connection .

  2. Object Number: 513051  Size: SH
  3. Disconnect the positive battery cable from the battery.

  4. Object Number: 513739  Size: SH
  5. Remove the remote positive stud cover.

  6. Object Number: 513740  Size: SH
  7. Remove the battery positive cable junction block lead nut (1) and disconnect the battery positive cable (2) from the underhood accessory wiring junction block.
  8. Raise and support the vehicle. Refer to Lifting and Jacking the Vehicle in General Information.

  9. Object Number: 473052  Size: SH
  10. Remove the positive battery cable nut (8) and remove the positive battery cable (9) from the starter motor BAT terminal.

  11. Object Number: 513769  Size: SH
  12. Remove the battery cable harness from the harness retainers (2,3,4).
  13. Remove the positive battery cable from the wiring harness conduit .

Installation Procedure

  1. Install the positive battery cable into the wiring harness conduit.

  2. Object Number: 513769  Size: SH
  3. Install the battery cable harness to the harness retainers (2,3,4).

  4. Object Number: 473052  Size: SH
  5. Install the positive battery cable (9) to the starter motor BAT terminal.
  6. Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.

  7. Install the starter motor BAT terminal nut (8).
  8. Tighten
    Tighten the starter motor switch BAT terminal nut (8) to 10 N·m (89 lb in).

  9. Lower the vehicle.

  10. Object Number: 513740  Size: SH
  11. Install the positive battery cable (2) and the positive battery cable junction block lead nut (1) to the underhood accessory wiring junction block.
  12. Tighten
    Tighten the positive battery cable junction block lead nut (1) to 15 N·m (11 lb ft).


    Object Number: 513739  Size: SH
  13. Install the remote positive stud cover.

  14. Object Number: 513051  Size: SH
  15. Connect the positive battery cable to the battery.
  16. Tighten
    Tighten the positive battery cable terminal bolt to 15 N·m (11 lb ft).

  17. Connect the negative battery cable to the battery. Refer to Battery Negative Cable Disconnection and Connection .