Pressure Link- Five Bow Pressure on Stowage Lid
Note: If working on a power top, locate the hydraulic pump bypass valve bolt on the front side turn it counterclockwise one revolution.
Adjust the lower pressure link to change the #5 bow pressure to the stowage compartment lid.
• | Decrease the pressure if the top material is contacting and marring the lid. |
• | Increase the pressure if water is leaking between the top and the lid. |
- Position the folding top with the #1 bow and the #5 bow up.
Note: The jamb nuts (1) are left handed thread.
When adjusting pressure link, each side be adjusted evenly.
- Loosen the jamb nut (1) on the pressure link where the adjuster attaches to the #5 bow.
- Mark the pressure link large adjustment nut (2) to aid in determining the amount of adjustment.
- Adjust the pressure link by rotating the large adjustment nut (2) one turn at a time.
Note: The maximum measurement on the pressure link is 32 mm (1.3 in) from the top of the threads (a) to the bottom of the large adjustment nut (b).
- Rotate the large adjustment nut (2) clockwise to increase the downward pressure of the #5 bow on the stowage lid. Turn the jamb nut (1) counter clockwise to decrease the downward pressure.
- Raise the top.
- Check the gap between the lid (2) and the #5 bow top cover material (1).
The gap between the lid and the top material should be 5 mm (0.2 in).
The gap between the five bow top material and the lid should be the same all the way across.
- Check the alignment of the front latch pins with their receivers.
The front latch pins should be aligned so that when the top is raised the pins drop into the receivers.
- Lower the top and re-adjust the pressure link as necessary.
- Position the folding top with the #1 bow and the #5 bow up.
Caution: Refer to Fastener Caution in the Preface section.
- Tighten the jamb nut (1).
Tighten
Tighten the nut to 14 N·m (10 lb ft).
- Raise and close the folding top to ensure proper alignment.
- Water test the folding top. Refer to
Waterleak Test Preparation.
Stopper Adjustment
Adjust top parallel side to side.
- Lower the folding top.
- Remove the body lock pillar upper trim to grain access the stopper.
- Loosen the adjuster jamb nut (2).
- Mark the adjuster nut to aid in determining the amount of adjustment.
Note: When adjusting the jamb nut Do not exceed (A)21 mm (B)(0.827 in) from the top of the jamb nut (1) to the bottom of the nut (2).
- Loosen the adjustment stopper (1), turn the nut one turn at a time.
- Raise and check the top for proper adjustment, readjust as needed.
- Check the alignment of the front latch pins with their receivers. The front latch pins should be aligned so that when the top is raised the pins drop into the receivers.
- Lower and re-adjust the top using the adjuster as necessary.
Caution: Refer to Fastener Caution in the Preface section.
- Tighten the jamb nut.
Tighten
Tighten the nut to 12 N·m (9 lb ft).
- Ensure that all the top adjustments are tighten and the power top works properly.
- Water test the folding top. Refer to
Waterleak Test Preparation.