Tools Required
J 42058 Frame Adapter Clamp
Removal Procedure
Notice: The frame rails and bumper impact bars must be serviced as required,
and returned to three-dimensional coordinates before any SMC repairs are attempted.
- Visually inspect for damage to the frame rails or wheelhouse mounting areas. Restore as much of the damage as possible to specifications using three-dimensional measuring procedures. Use J 42058
if vehicle pulling and straightening are required.
- Remove all panels and components to gain access to door side frame. The door side frame can be removed if the quarter panel is loosened from it. This may include removal of the following components:
• | Quarter inner splash shield |
- Remove latch striker closeout cover and striker.
- Remove the trim screws that attach the side door frame panel to the rail. These screws must be re-installed to secure the service panel in place until the adhesive cures.
Important: Make sure the fuel inlet is sealed before proceeding with repair procedure.
- Use caution along the underside of the vehicle when applying heat not to de-bond the floor panels from the frame rail.
- Apply heat and pry to break bond along area (1).
Installation Procedure
- Remove all remaining adhesive, and scuff all bonding surfaces to ensure proper adhesion.
- Clean and prepare all bonding surfaces prior to SMC panel installation. Refer to
Plastic Panels
in Plastic Panel Information and Repair.
- Prime all bare metal surfaces with PPGs DP90, or an equivalent epoxy anti-corrosion primer. Do not top-coat any bonding surface.
- Temporarily fit the side door opening assembly to ensure proper fit and alignment with adjacent panels.
- Remove panel assembly and apply a consistent bead of adhesive (1) to the front body hinge pillar and top surface of rail (2) and to all areas originally bonded, except for bottom side of rail.
- The bead should be 10 mm (13/32 in) diameter.
- This area is bonded after the side door opening assembly is installed.
- Install assembly using original screws in factory locations. The screws are necessary to secure the service part until the adhesive cures.
Important: Ensure that the foam seal on the front body hinge pillar portion of the side door opening panel makes contact with the front hinge pillar.
Important: Use only approved adhesives. Refer to
Rigid Plastic Part Repair Materials
in Plastic Panel Information and Repair.
- Apply adhesive to inner edge of rocker and clamp in place until adhesive cures. Standoffs in part must fit flush against bottom of rail.
- Remove excess adhesive squeeze-out and allow to cure.
- Prime bare metal areas with PPGs DP90, or an equivalent epoxy anti-corrosion primer. Do not combine paint systems. Always refer to paint manufacturer's recommendations.
- Install all related panels and components.