Removal Procedure
- Remove the IP trim pad. Refer to
Instrument Panel Upper Trim Pad Replacement
in Instrument Panel, Gauges and Console.
- Remove the defroster door vacuum actuator.
- Remove the air distribution case cover
retaining screws.
- Remove the air distribution case cover.
- Remove and discard the air distribution case seal.
- Remove the linkage between the air temperature door and the heater door
on the left side of the HVAC module assembly.
- Remove the defroster door.
Installation Procedure
- Install the defroster door.
- Connect the linkage between the air temperature door and the
heater door.
- Install a new air distribution case seal
- Install the air distribution case cover.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the air distributor case cover retaining screws.
Tighten
Tighten the screws to 1.6 N·m (14 lb in).
- Install the defroster door vacuum actuator.
- Install the IP trim pad. Refer to
Instrument Panel Upper Trim Pad Replacement
in Instrument Panel, Gauges
and Console.