Important: A short to ground will cause an open fuse(s). Before performing this diagnostic procedure, inspect the fuse(s) for an open.

1

  1. Remove the scan tool from the data link connector (DLC).
  2. Measure the voltage between terminal 16 of the DLC and ground.

Is the voltage measured to the specified value?

B+

Go to Step 2

Go to Step 3

2

Measure the voltage between terminal 5 and terminal 16 of the DLC.

Is the voltage measured to the specified value?

B+

Go to Step 4

Go to Step 5

3

Repair the open in CKT 40 between the fuse block and the DLC. Refer to Wiring Repairs in Wiring Systems.

Is the repair complete?

--

Go to Data Link Communications System Check

--

4

Measure the voltage between terminal 4 and terminal 16 of the DLC.

Is the voltage measured to the specified value?

B+

Go to Step 6

Go to Step 7

5

Repair the open in CKT 451 between the DLC and G110. Refer to Wiring Repairs in Wiring Systems.

Is the repair complete?

--

Go to Data Link Communications System Check

--

6

  1. Reconnect the scan tool to the DLC.
  2. Attempt to establish communication with each module connected to the DLC.

Can communication be established with each module?

--

Go to Data Link Communications System Check

Go to Step 8

7

Repair the open in CKT 150 between the DLC and G204. Refer to Wiring Repairs in Wiring Systems.

Is the repair complete?

--

Go to Data Link Communications System Check

--

8

Refer to the appropriate diagnostic table within this section.

Is the repair complete?

--

Go to Data Link Communications System Check

--