Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Check for leaks at the pipe joints. Are there any leaks? | -- | -- | |
2 | Tighten the fasteners at the leaking joint(s) to specification. Refer to Fastener Tightening Specifications . Are there still leaks? | -- | -- | System OK |