GM Service Manual Online
For 1990-2009 cars only

Engine Coolant Thermostat Replacement 2.4 L

Removal Procedure

    Caution: Unless directed otherwise, the ignition and start switch must be in the OFF or LOCK position, and all electrical loads must be OFF before servicing any electrical component. Disconnect the negative battery cable to prevent an electrical spark should a tool or equipment come in contact with an exposed electrical terminal. Failure to follow these precautions may result in personal injury and/or damage to the vehicle or its components.

    Notice: When adding coolant, it is important that you use GM Goodwrench DEX-COOLâ„¢ coolant. If coolant other than DEX-COOLâ„¢ is added to the system, the engine coolant will require change sooner: at 50 000 km (30,000 miles) or 24 months.

  1. Disconnect the negative battery cable.
  2. Drain and recover the coolant.
  3. Refer to Cooling System Draining and Filling .

  4. Remove the exhaust manifold heat shield. Refer to Exhaust Manifold Replacement in Engine Mechanical - 2.4L.

  5. Object Number: 181844  Size: LH
  6. Remove the coolant inlet housing bolts through the exhaust manifold.
  7. Raise the vehicle. Refer to Lifting and Jacking the Vehicle .
  8. Remove the coolant inlet housing stud from the oil pan.
  9. Remove the tire and wheel assembly. Refer to Tire and Wheel Removal and Installation in Tires and Wheels.
  10. Remove the splash shield. Refer to Wheelhouse Splash Shield Replacement in Body Front End.
  11. Remove the bolts from the transaxle-to-engine block brace. Remove the brace. Refer to Transmission Replacement in Automatic Transmission 4T40 - E/4T45 - E.
  12. Remove the coolant housing pipe.
  13. Remove the thermostat.
  14. Clean the mating surfaces.

Installation Procedure


    Object Number: 181844  Size: LH
  1. Install the thermostat.
  2. Install the coolant housing pipe.
  3. Install the transaxle-to-engine block brace and secure with the bolts. Refer to Transmission Replacement in Automatic Transmission 4T40 - E/4T45 - E.
  4. Install the splash shield. Refer to Wheelhouse Splash Shield Replacement in Body Front End.
  5. Install the tire and wheel assembly. Refer to Tire and Wheel Removal and Installation in Tires and Wheels.
  6. Install the gasket.
  7. Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.

  8. Install the coolant inlet housing stud to the oil pan.
  9. Tighten
    Tighten the bolt to 26 N·m (19 lb ft).

  10. Lower the vehicle.
  11. Install the coolant inlet housing bolts through the exhaust manifold.
  12. Tighten
    Tighten the bolt to 14 N·m (124 lb in).

  13. Install the exhaust manifold heat shield. Refer to Exhaust Manifold Replacement in Engine Mechanical - 2.4L.
  14. Fill the cooling system.
  15. Refer to Cooling System Draining and Filling .

    or Exhaust Manifold Replacement

  16. Connect the negative battery cable.
  17. Tighten
    Tighten the bolt to 16 N·m (12 lb ft).

  18. Inspect the system for leaks.

Engine Coolant Thermostat Replacement 3.4 L

Removal Procedure

    Caution: Unless directed otherwise, the ignition and start switch must be in the OFF or LOCK position, and all electrical loads must be OFF before servicing any electrical component. Disconnect the negative battery cable to prevent an electrical spark should a tool or equipment come in contact with an exposed electrical terminal. Failure to follow these precautions may result in personal injury and/or damage to the vehicle or its components.

  1. Disconnect the negative battery cable.
  2. Drain and recover the coolant.
  3. Refer to Cooling System Draining and Filling .

  4. Remove the air cleaner assembly. Refer to Air Cleaner Assembly Replacement in Engine Controls - 3.4L.
  5. or Air Cleaner Assembly Replacement

  6. Remove the surge tank line from the coolant outlet.

  7. Object Number: 181846  Size: SH
  8. Remove the coolant outlet to the inlet manifold attaching bolts.
  9. Remove the coolant outlet.
  10. Remove the thermostat.
  11. Clean the inlet manifold mating surfaces.
  12. Clean the coolant outlet mating surfaces.

Installation Procedure

  1. Install the thermostat in the inlet manifold.

  2. Object Number: 181846  Size: SH
  3. Install the coolant outlet to the inlet manifold.
  4. Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.

  5. Install the attaching bolts.
  6. Tighten
    Tighten the bolts to 25 N·m (18 lb ft).

  7. Install the air cleaner assembly. Refer to Air Cleaner Assembly Replacement in Engine Controls - 3.4L.
  8. or Air Cleaner Assembly Replacement

  9. Install the surge tank line to the coolant outlet.
  10. Fill the engine with coolant.
  11. Refer to Cooling System Draining and Filling .

  12. Connect the negative battery cable.
  13. Tighten
    Tighten the bolt to 16 N·m (12 lb ft).

  14. Inspect the system for leaks. Refer to Cooling System Leak Testing .