Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
Schematic Reference: Instrument Cluster Schematics | ||||
1 | Did you review the operation and perform the necessary inspections? | -- | Go to Step 2 | |
2 | Inspect for poor connections at the DIC switches. Refer to Testing for Intermittent Conditions and Poor Connections and to Connector Repairs in Wiring Systems. Did you find and correct the condition? | -- | Go to Step 4 | Go to Step 3 |
3 | Replace the IPC. Refer to Instrument Cluster Replacement in Instrument Panel, Gages, and Console. Did you complete the replacement? | -- | Go to Step 4 | -- |
4 | Operate the system in order to verify the repair. Did you correct the condition? | -- | System OK | Go to Step 2 |