Removal Procedure
- Open IP storage compartment
door.
- Lift door slightly and twist the stop rod to disengage t-end from
door.
- Remove four fasteners (1)
from bin to IP retainer.
- Slide IP storage compartment partially outward and remove electrical
connectors as needed.
- Remove IP storage compartment.
Installation Procedure
- Partially insert IP storage
compartment into IP retainer and reconnect electrical connections.
- Install the four fasteners (1) from bin into
IP retainer.
- Lift door lightly and
put stop rod into hole in the door and twist to engage.
- Close IP storage compartment door and verify proper alignment.