Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.
Tighten
Tighten the shock absorber lower retaining bolts to 25 N·m
(18 lb ft).
Important: Before lowering the vehicle onto its wheels (or before driving the vehicle, if it was not on a lift) turn the ignition on and wait approximately 45 seconds. This will permit the ALC system to execute the ARC, ensuring that the air adjustable shock absorbers are filled with residual pressure.
Tighten
Tighten the shock absorber upper retaining nuts to 25 N·m
(18 lb ft).