Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
DEFINITION: All power windows inoperative from all door window switches. | ||||
1 | Was the Power Door System Diagnostic System Check performed? | -- | Go to Step 2 | |
2 |
Is the resistance within the specified range? | 0-5 ohms | Go to Step 4 | Go to Step 3 |
3 | Replace the PWR WDO circuit breaker. Is the replacement complete? | -- | -- | |
4 | Using a DMM, measure the voltage between both rear junction block PWR WDO circuit breaker #57 terminals and ground. Is the voltage within the specified range for either measurement? | 10-15 V | Go to Step 5 | Go to Power Distribution Schematics . |
5 | Repair CKT 1040 for an open or high resistance at rear junction block. Refer to Wiring Repairs in Wiring Systems. Is the repair complete? | -- | -- |