Object Number: 1703232  Size: SH

Important: A structural nylon block (1) is located between the rear floor panel and the frame rail (2) on both the right and the left side of the vehicle. Precast structural nylon replacement blocks are available if necessary, and can be ordered separately.

Failure to replace any damaged structure nylon reinforcement as described could compromise the structural integrity of the vehicle.

Caution: Refer to Approved Equipment for Collision Repair Caution in the Preface section.


    Object Number: 1703234  Size: SH

    Important: Some vehicles have a mwetal top plate attached to the nylon block. This component is removeable after the adhesive has been removed.

  1. Remove the rear frame rail. Refer to Rear Rail Replacement.
  2. Remove the damaged structural nylon reinforcement.

  3. Object Number: 1703235  Size: SH

    Important: Do NOT remove existing primer from the inner panels when removing the structural block.

  4. If the floor panel is not being replaced, use a chisel or equivalent to remove the excess and loose structural adhesive from the floor panel.

Installation Procedure

    Important: Use only enough naphtha solvent to dampen a cloth. Too much solvent may saturate the structural foam reinforcement and may migrate out later, affecting the bond strength of the adhesive.

  1. Clean the replacement structural nylon reinforcement and all of the mating surfaces with naphtha solvent and allow to dry thoroughly.

  2. Object Number: 1703236  Size: SH

    Important: The adhesive has a 40-50 minute work time. Do NOT allow the adhesive to cure prior to installing the structural foam reinforcement to the vehicle and to the inner hinge pillar reinforcement.

  3. Apply 9-13 mm beads of Fusor 120 adhesive GM P/N 12345726 to the reinforcement mating surface of the rail assembly.

  4. Object Number: 1703237  Size: SH

    Important: Do NOT pull the structural nylon reinforcement apart from the adjacent panels after the panels have been joined together. Slide the reinforcements from side to side, or up and down, for proper alignment.

  5. Position the structural nylon reinforcement to the rail. Push the nylon reinforcement firmly into place.

  6. Object Number: 1703239  Size: SH
  7. Temporarily hold the structural nylon reinforcement in place with tape.
  8. Remove the tape from the structural nylon block.

  9. Object Number: 1703242  Size: SH
  10. Apply 9-13 mm beads of Fusor 120 adhesive GM P/N 12345726 (Canadian P/N 10953521) to the reinforcement mating surface of the floor panel, as shown. Apply the adhesive between the nylon reinforcement and the reinforcement metal top plate.
  11. Important: Do NOT pull the frame rail assembly apart from the structural nylon reinforcement after the parts have been joined together. Slide the outer panel from side to side, or up and down, for proper alignment.

  12. Position the frame rail assembly and clamp into place. Refer to Rear Rail Replacement.