Refer to Instrument Cluster: Analog Schematics
The battery voltage is supplied to the IPC connector C1 terminals A1 and B1.
When the IPC is awake, the voltage at the IPC connector C1 terminals A1 and B1 are measured every 300 ms.
This DTC indicates a circuit malfunction is preventing the alternator from charging.
The battery voltage measured at the IPC connector C1 terminals A1 and B1 is less than 9 V for four 4 monitoring cycles.
No loss of the class 2 serial data DTCs are set.
Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Did you perform the Diagnostic System Check? | -- | Go to Step 2 | |
2 |
Is the voltage greater than the specified value? | 10 V | Go to Step 3 | Go to Step 6 |
3 |
Is the voltage display greater than the specified value? | 10 V | Go to Step 4 | Go to Step 5 |
4 | Replace the IPC. Is the repair complete? | -- | -- | |
5 | Repair the open in CKT 240 (ORN). Is the repair complete? | -- | -- | |
6 | Visually inspect the CLUSTER fuse. Is the cluster fuse open? | -- | Go to Step 7 | -- |
7 | Replace the CLUSTER fuse. Was the fuse replaced? | -- | -- |