GM Service Manual Online
For 1990-2009 cars only

Removal Procedure

  1. Drain the coolant. Refer to Cooling System Draining and Filling .
  2. Remove the battery. Refer to Battery Replacement in Engine Electrical.
  3. Remove the surge tank retaining bolts.
  4. Disconnect the surge tank hoses.
  5. Disconnect electrical connector from sensor.

  6. Object Number: 72196  Size: SH
  7. Remove the surge tank.

Installation Procedure

  1. Connect the low coolant sensor connector.

  2. Object Number: 72196  Size: SH
  3. Install the surge tank.
  4. Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.

  5. Install the surge tank retaining bolts.
  6. Tighten
    Tighten the bolts to 6 N·m (53 lb in).

  7. Connect the surge tank hoses.
  8. Install the battery. Refer to Battery Replacement in Engine Electrical.
  9. Refill the cooling system. Refer to Cooling System Draining and Filling .