Removal Procedure
- Remove the pivot pin (2).
- Remove the lever (3) from the column (1).
Installation Procedure
- Position the lever (3)
on the column (1).
Ensure that the tang on the lever (3) engages the spring in the
column.
- Install the pivot pin (2).
- Inspect the lever operation for a positive shift gate feel in
all of the positions.