Removal Procedure
- Remove the auxiliary generator. Refer to
Auxiliary Generator Replacement
.
- Remove the power steering pump pulley. Refer to
Power Steering Pump Pulley Replacement
in Power Steering System.
- Remove the bolt securing the power steering pressure
hose to the auxiliary generator bracket.
- Remove the bolts securing the auxiliary generator
bracket to the cylinder head and the power steering pump.
- Remove the auxiliary generator bracket from the engine.
Installation Procedure
- Position the auxiliary generator bracket to the
engine.
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the bolts securing
the auxiliary generator bracket to the cylinder head and the power steering
pump.
Tighten
Tighten the auxiliary generator bracket mounting bolts to 30 N·m (22 lb ft).
- Install the bolt securing the power steering
pressure hose to the auxiliary generator bracket.
Tighten
Tighten the power steering pressure hose to auxiliary generator bracket
bolt to 17 N·m (13 lb ft).
- Install the power steering pump pulley. Refer to
Power Steering Pump Pulley Replacement
in Power Steering System.
- Install the auxiliary generator. Refer to
Auxiliary Generator Replacement
.