GM Service Manual Online
For 1990-2009 cars only

    Object Number: 205499  Size: SH
  1. Remove the intake manifold sight shield retaining nuts (1).
  2. Remove the intake manifold sight shield.

  3. Object Number: 71512  Size: SH
  4. Disconnect the spark plug wires from the left bank spark plugs and the molded retainers in the intake manifold. Lay the wires aside.

  5. Object Number: 205668  Size: SH
  6. Disconnect the PCV dirty air tube (1) from the PCV valve (2) and the intake manifold.

  7. Object Number: 331797  Size: SH
  8. Disconnect the PCV fresh air feed tube (1) from the camshaft cover and intake manifold.

  9. Object Number: 315113  Size: SH
  10. Remove the PCV valve from the camshaft cover.

  11. Object Number: 53639  Size: SH
  12. Disconnect the EGR and crankcase ventilation pipe at the throttle body spacer.

  13. Object Number: 211443  Size: SH
  14. Disconnect the fuel rail ground wire at the rear cylinder head.
  15. Disconnect the fuel rail bracket retaining nut at the inner EGR mounting stud.

  16. Object Number: 211458  Size: SH
  17. Remove the purge solenoid harness by removing the retaining bolt and disconnecting from the intake manifold.

  18. Object Number: 205490  Size: SH
  19. Disconnect the throttle body heater hose (3) from the water crossover (4).

  20. Object Number: 206312  Size: SH
  21. Disconnect the throttle body heater outlet hose (1) from the throttle body (3) and remove the coolant overflow pipe (5) from the intake manifold studs (4).

  22. Object Number: 331856  Size: SH
  23. Loosen and remove the intake manifold studs (1), spacers (2) and bolts (3).
  24. Remove the intake manifold assembly.
  25. Important: The intake manifold carrier gaskets are attached to the intake manifold through a snap-lock feature. When you remove the intake manifold, the carrier gaskets will remain attached to the manifold. It is not necessary to replace the gaskets unless there is damage to the seals.

Intake Manifold Disassembly


    Object Number: 205484  Size: SH

    Important: The following steps are only necessary if the throttle body or intake manifold require replacement.

  1. Remove the upper (2) and lower (3) throttle body (4) to spacer (1) retaining bolts.

  2. Object Number: 205480  Size: SH
  3. Remove the throttle body gasket (1) and discard. Make sure all gasket material is removed from the throttle body (3) and intake manifold.

  4. Object Number: 350281  Size: SH
  5. Remove the MAP sensor from the top of the spacer mounting location.

  6. Object Number: 205474  Size: SH
  7. Remove the throttle body spacer retaining bolts (2) and throttle body spacer (1) from the intake manifold.

  8. Object Number: 315073  Size: SH
  9. Disconnect the fuel injector connector from each fuel injector.
  10. Remove the fuel injector wire harness.

  11. Object Number: 205428  Size: SH
  12. Disconnect the eight fuel rail snap lock retainers by squeezing the tab and lifting the fuel rail simultaneously.

  13. Object Number: 211456  Size: SH
  14. Disconnect the fuel regulator vacuum tube.

  15. Object Number: 331876  Size: SH
  16. Remove the power brake booster vacuum hose.

  17. Object Number: 205463  Size: SH
  18. Lift the entire fuel rail and injector assembly from the intake manifold when all eight snap lock retainers are released. Keep the fuel rail ground wire (1) clear of the manifold.