Important: Sealing surfaces need to be clean and dry.
Use care when applying the sealant, not to carry over sealant to the bolt holes.Important: Installation of the upper oil pan must be carried out within 5 to 10 minutes of applying the sealant.
Notice: Use the correct fastener in the correct location. Replacement fasteners must be the correct part number for that application. Fasteners requiring replacement or fasteners requiring the use of thread locking compound or sealant are identified in the service procedure. Do not use paints, lubricants, or corrosion inhibitors on fasteners or fastener joint surfaces unless specified. These coatings affect fastener torque and joint clamping force and may damage the fastener. Use the correct tightening sequence and specifications when installing fasteners in order to avoid damage to parts and systems.
Tighten
Tighten the upper oil pan bolts to 15 N·m (11 lb ft).