Removal Procedure
- Place a drain pan under the power steering fluid reservoir and
gear.
- Siphon the fluid from the reservoir to prevent excessive spillage.
- Remove the engine shield.
- Remove the front fascia. Refer to
Front Bumper Fascia Replacement
in Bumpers.
- Remove the cooling pipe
retaining clips (1) from the crossmember and from in the engine compartment
(3).
- Remove the power steering fluid gear outlet hose at the reservoir.
- Raise and support the vehicle. Refer to
Lifting and Jacking the Vehicle
in General Information.
- Reposition the Electronic Brake Control Module/Brake Pressure
Modulator Valve (EBCM) assembly to access the power steering fluid
cooling pipe connections. Opening of the brake hydraulic system and
removal of the EBCM assembly is not necessary to reposition. Refer
to
Electronic Brake Control Module Replacement
in Antilock Brake System.
- Lower the vehicle.
- Remove the power steering fluid cooling pipe.
Installation Procedure
- Install the power steering fluid cooling pipe.
- Raise and support the vehicle. Refer to
Lifting and Jacking the Vehicle
in General Information.
- Position the Electronic Brake Control Module/Brake Pressure Modulator
Valve (EBCM) assembly. Refer to
Electronic Brake Control Module Replacement
in Antilock Brake System.
- Lower the vehicle.
- Install the power steering fluid gear outlet hose at the reservoir.
- Install the cooling pipe
retaining clips to the crossmember (1) and in the engine compartment (3).
- Install the front fascia. Refer to
Front Bumper Fascia Replacement
in Bumpers.
- Install the engine shield.
- Bleed the power steering system. Refer to
Power Steering System Bleeding
.