Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Was the Diagnostic System Check performed? | -- | Go to Step 2 | Go to Horns System Check |
2 |
Does the test lamp light? | -- | Go to Step 3 | Go to Step 4 |
3 |
Does the test lamp light? | -- | Go to Step 6 | Go to Step 5 |
4 | Repair the open or the poor connection in CKT 29 (DK GRN). Is the repair complete? | -- | Go to Horns System Check | -- |
5 | Repair the poor connection or the open in CKT 150 (BLK) or CKT 250 (BLK). Is the repair complete? | -- | Go to Horns System Check | -- |
6 | Test the horn connector for proper terminal contact. Are the horn connector contacts OK? | -- | Go to Step 8 | Go to Step 7 |
7 | Replace the horn connector contacts. Is the repair complete? | -- | Go to Horns System Check | -- |
8 | Replace the horn. Is the repair complete? | -- | Go to Horns System Check | -- |