Removal Procedure
- Remove the right closeout/insulator
panel. Refer to
Instrument Panel Insulator Panel Replacement
.
- Remove the 2 fasteners from the relay/fuse center (1)
at the lower instrument panel.
- Remove the fastener from the forward side of the IP carrier above
the relay/fuse center (1).
- Disengage the 4 cam locks that secure the harness connectors
to the relay/fuse center (1).
Pull down on the tabs.
- Remove the relay/fuse center (1) from the IP.
Installation Procedure
- Align the relay/fuse center (1)
to the lower IP.
- Install the harness connectors to the relay/fuse center (1).
Engage the cam locks.
- Install the fasteners.
- Install the right closeout/insulator panel. Refer to
Instrument Panel Insulator Panel Replacement
.