Step | Action | Value(s) | Yes | No |
---|---|---|---|---|
1 | Did you perform the Data Link Communications Diagnostic System Check? | -- | Go to Step 2 | |
2 |
Does the scan tool communicate with the vehicle? | -- | Go to Step 4 | Go to Step 3 |
3 | The scan tool may be malfunctioning. Refer to the scan tool instruction manual in order to ensure that the scan tool is functioning. Does the scan tool operate properly? | -- | Go to Step 33 | -- |
4 |
Is the terminal contact between the DLC and the scan tool OK? | -- | Go to Step 6 | Go to Step 5 |
5 | Repair the terminal contact at the DLC. Is the repair complete? | -- | Go to Step 33 | -- |
6 | Turn the ignition switch to RUN with the engine off. Does the scan tool turn on? | -- | Go to Step 12 | Go to Step 7 |
7 | Measure the voltage between DLC terminal 16 and chassis ground. Is the voltage within the specified range? | 10-15 V | Go to Step 9 | Go to Step 8 |
8 | Repair the open or short to ground in CKT 1140 (ORN). Is the repair complete? | -- | Go to Step 33 | -- |
9 | Measure the voltage from the DLC terminal 16 to terminal 5. Is the voltage within the specified range? | 10-15 V | Go to Step 11 | Go to Step 10 |
10 | Repair the open in CKT 351 (BLK/WHT). Is the repair complete? | -- | Go to Step 33 | -- |
11 | Repair the open in CKT 350 (BLK). Is the repair complete? | -- | Go to Step 33 | -- |
12 | Measure the voltage from the DLC terminal 2 to ground. Is the voltage within the specified range? | 10-15 V | Go to Step 15 | Go to Step 13 |
13 | Measure the resistance from the DLC terminal 2 to ground. Is the resistance within the specified value? | 0-5 ohms | Go to Step 24 | Go to Step 14 |
14 | Repair the open in CKT 1807 (PPL) between DLC terminal 2 and C200 terminal A. Is the repair complete? | -- | Go to Step 33 | -- |
15 |
Is the voltage within the specified range? | 10-15 V | Go to Step 17 | Go to Step 16 |
16 | Repair the short to battery positive voltage (B+) in CKT 1807 (PPL) between C206 terminal B5 and B6. Is the repair complete? | -- | Go to Step 33 | -- |
17 |
Is the voltage within the specified range? | 10-15 V | Go to Step 19 | Go to Step 18 |
18 | Repair the short to battery positive voltage (B+) in CKT 1807 (PPL) between C206 terminal B5 and C310 terminal A3. Is the voltage within the specified range? | 10-15 V | Go to Step 33 | -- |
19 |
Is the voltage within the specified range? | 10-15 V | Go to Step 21 | Go to Step 20 |
20 | Repair the short to battery positive voltage (B+) in CKT 1807 (PPL) between the IP junction block connector C4 terminal F1 and C310 terminal A3. Is the repair complete? | -- | Go to Step 33 | -- |
21 |
Is the voltage within the specified range? | 10-15 V | Go to Step 22 | Go to Step 23 |
22 | Repair the short to battery positive voltage (B+) in CKT 1807 (PPL) between C206 terminal B6 and the IP junction block connector C1 terminal D12. If OK, replace the IP junction block. Is the repair complete? | -- | Go to Step 33 | -- |
23 | Repair the short to battery positive voltage (B+) in CKT 1807 (PPL) between IP junction block connector C4 terminal D1 and E1. Is the repair complete? | -- | Go to Step 33 | -- |
24 |
Is the resistance within the specified value? | 0-5 ohms | Go to Step 26 | Go to Step 25 |
25 | Repair the short to ground in CKT 1807 (PPL) between C206 terminal B5 and B6. Is the repair complete? | -- | Go to Step 33 | -- |
26 |
Is the resistance within the specified value? | 0-5 ohms | Go to Step 28 | Go to Step 27 |
27 | Repair the short to ground in CKT 1807 (PPL) between C206 terminal B5 and C310 terminal A3. Is the repair complete? | -- | Go to Step 33 | -- |
28 |
Is the resistance within the specified value? | 0-5 ohms | Go to Step 30 | Go to Step 29 |
29 | Repair the short to ground in CKT 1807 (PPL) between IP junction block connector C4 terminal F1 and C310 terminal A3. Is the repair complete? | -- | Go to Step 33 | -- |
30 |
Is the resistance within the specified value? | 0-5 ohms | Go to Step 31 | Go to Step 32 |
31 | Repair the short to ground in CKT 1807 (PPL) between C206 terminal B6 and IP junction block connector C1 terminal D12. If OK, replace the IP block. Is the repair complete? | -- | Go to Step 33 | -- |
32 | Repair the short to ground in CKT 1807 (PPL) between IP junction block connector C4 terminal D1. Is the repair complete? | -- | Go to Step 33 | -- |
33 |
Are all of the DTCs cleared? | -- | -- |